NINE MILE METALS CONTINUES TO DRILL VMS (CU-PB-ZN-AG-AU) MINERALIZATION AT ITS CALIFORNIA LAKE PROJECT, NB
VANCOUVER, B.C. – NINE MILE METALS LTD. (CSE: NINE, OTCQB: VMSXF, FSE: KQ9) (the “Company” or “Nine Mile”) is pleased to announce it has drilled additional VMS mineralization at its inaugural California Lake VMS project drill program, in the world-famous Bathurst Mining Camp in New Brunswick. Hole CL2207 was collared 10 meters west of Hole CL2206 (previously announced November 1, 2022) and drilled from east to west, along the same azimuth at a dip of – 45 degrees to confirm and expand on the mineralized sections in Hole CL2206. Drill Hole CL2207 first intersected VMS mineralization at a depth of 39 meters with sulphide mineralogy continuing to 50 meters. A total of 6 zones of Cu, Pb, Zn, Ag, Au bearing, BMC style, VMS mineralization were intersected, further confirming the potential of the California Lake target. Photos 1-3 Above: Confirmed VMS (Cu-Pb-Zn-Ag-Au) Drill Core, Hole CL2207, California Lake Project “We are pleased to announce that we continue to drill VMS mineralization at our inaugural California Lake Phase #1 drill program. This is exceptional based that we have targeted this program on just re-processed MegaTEM and strong late time conductive targets identified by our technical partner, EarthEx Geophysical Solutions Inc. We are committed to de-risking our projects and using leading edge, new technology and economic exploration methods here at our California Lake Project. Once we complete our drill program, analyze all the relevant data, and model our results, we will be able to design an advanced geophysics program to expand the exploration program along the conductive trend and at depth. This was designed as an introductory short drill program based on our identification process and we look forward to announcing further results”, stated Patrick J. Cruickshank, MBA, CEO & Director. Photos 4-6 Above: Additional VMS Core, Hole CL2207 California Lake Project, BMC, New Brunswick “Our drilling continues to be successful along this 1.5-kilometer geophysical target, the numerous zones of VMS mineralization over a 15-meter width further confirming its potential. We look forward to expanding the mineralized zone along strike and depth by both drilling and future detailed ground geophysics” stated Gary Lohman, B.Sc., P. Geo., Director. The disclosure of technical information in this news release has been prepared in accordance with Canadian regulatory requirements as set out in National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) and reviewed and approved by Gary Lohman, B.Sc., P. Geo., Director who acts as the Company’s Qualified Person and is not independent of the Company. About Nine Mile Metals Ltd.: Nine Mile Metals Ltd. is a Canadian public mineral exploration company focused on Critical Minerals VMS (Cu, Pb, Zn, Ag and Au) exploration in the world-famous Bathurst Mining Camp, New Brunswick, Canada. The Company’s primary business objective is to explore its three VMS Projects: Nine Mile Brook VMS Project; California Lake VMS Project; and the Canoe Landing Lake (East – West) VMS Project. The Company is focused on exploration of Minerals for Technology (MFT), positioning for the boom in EV and green technologies requiring Copper, Silver, Lead and Zinc with a hedge with Gold. ON BEHALF OF NINE MILE METALS LTD. “Patrick J. Cruickshank, MBA” CEO and Director T: 506-804-6117 E: patrick@ninemilemetals.com Forward-Looking Information: This press release may include forward-looking information within the meaning of Canadian securities legislation, concerning the business of Nine Mile. Forward-looking information is based on certain key expectations and assumptions made by the management of Nine Mile. In some cases, you can identify forward-looking statements by the use of words such as “will,” “may,” “would,” “expect,” “intend,” “plan,” “seek,” “anticipate,” “believe,” “estimate,” “predict,” “potential,” “continue,” “likely,” “could” and variations of these terms and similar expressions, or the negative of these terms or similar expressions. . Forward-looking statements in this press release include that (a) we will be able to design an advanced geophysics program to expand the exploration program along the conductive trend and at depth, (b) a total of 6 zones BMC style, VMS mineralization were intersected, further confirming the potential of the California Lake target, (c) the Company’s drilling continues to be successful along this 1.5-kilometer geophysical target, (d) the numerous zones of VMS mineralization over a 15-meter width further confirming California Lake’s potential, and (e) we continue to drill VMS mineralization at our inaugural California Lake Phase #1 drill program. Although Nine Mile believes that the expectations and assumptions on which such forward-looking information is based are reasonable, undue reliance should not be placed on the forward-looking information because Nine Mile can give no assurance that they will prove to be correct. The Canadian Securities Exchange (CSE) has not reviewed and does not accept responsibility for the adequacy or the accuracy of the contents of this release
NINE MILE METALS DRILLS VMS (CU-PB-ZN-AG-AU) ON ITS CALIFORNIA LAKE PROJECT, NB
VANCOUVER, B.C. – NINE MILE METALS LTD. (CSE: NINE, OTCQB: VMSXF, FSE: KQ9) (the “Company” or “Nine Mile”) is pleased to announce it has drilled and confirmed a VMS system at its inaugural California Lake Project drill program, in the world-famous Bathurst Mining Camp in New Brunswick. Two orientation drill holes were collared at California Lake to intersect the geophysical trend defined by the late time conductance in the reprocessed MegaTEM data as defined by EarthEx Geophysical Solutions Inc. (“EarthEx”). The holes also confirmed both the geological sequence and structure that is known to host the mineralization. Having established a base model, an 89-meter hole was drilled due west at a dip of -45 degrees intersecting sulphides between 43.00 and 57.00 meters, including numerous zones of massive Cu, Pb, Zn, Ag, Au bearing, BMC style, VMS mineralization as displayed in the four photos below. Figures 1 & 2: Confirmed VMS (Cu-Pb-Zn-Ag-Au) Drill Core, California Lake Project, NB Canada “We are pleased to confirm a VMS system on our California Lake Project in our stage #1 drill program and add a viable VMS exploration project in Nine Mile’s portfolio. We are in early stages of this drill program, but this further defines that our scientific, leading edge technology exploration process continues to deliver results. We will continue to be driven by our unique exploration processes and the next steps will be to measure, photograph, log and cut the samples for our internal XRF screening process to identify the sample sections for certified Lab Analysis to ALS Global Labs, North Vancouver, British Columbia. We look forward to reporting further results from our drill program at California Lake”, stated Patrick J. Cruickshank, MBA, CEO & Director. Figures 3 & 4: Additional VMS Core, California Lake Project, BMC, New Brunswick, Canada “Our unique exploration process continues to be successful and we look forward to completing our current drill program and reporting on additional results” stated Gary Lohman, P.Geo, Director & VP. Exploration. The disclosure of technical information in this news release has been prepared in accordance with Canadian regulatory requirements as set out in National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) and reviewed and approved by Gary Lohman, B.Sc., P. Geo. VP Exploration who acts as the Company’s Qualified Person, and is not independent of the Company. About Nine Mile Metals Ltd.: Nine Mile Metals Ltd. is a Canadian public mineral exploration company focused on Critical Minerals VMS (Cu, Pb, Zn, Ag and Au) exploration in the world-famous Bathurst Mining Camp, New Brunswick, Canada. The Company’s primary business objective is to explore its three VMS Projects: Nine Mile Brook VMS Project; California Lake VMS Project; and the Canoe Landing Lake (East – West) VMS Project. The Company is focused on exploration of Minerals for Technology (MFT), positioning for the boom in EV and green technologies requiring Copper, Silver, Lead and Zinc with a hedge with Gold. ON BEHALF OF NINE MILE METALS LTD. “Patrick J. Cruickshank, MBA” CEO and Director T: 506-804-6117 E: patrick@ninemilemetals.com Forward-Looking Information: This press release may include forward-looking information within the meaning of Canadian securities legislation, concerning the business of Nine Mile. Forward-looking information is based on certain key expectations and assumptions made by the management of Nine Mile. In some cases, you can identify forward-looking statements by the use of words such as “will,” “may,” “would,” “expect,” “intend,” “plan,” “seek,” “anticipate,” “believe,” “estimate,” “predict,” “potential,” “continue,” “likely,” “could” and variations of these terms and similar expressions, or the negative of these terms or similar expressions. . Forward-looking statements in this press release include that (a) an 89-meter hole was drilled intersecting sulphides between 43.00 and 57.00 meters, including numerous zones of massive Cu, Pb, Zn, Ag, Au bearing, VMS mineralization, (b) our scientific, leading edge technology exploration process continues to deliver results, (c) the Company will continue to be driven by our unique exploration processes and the next steps will be to measure, photograph, log and cut the samples for our internal XRF screening process to identify the sample sections for certified Lab Analysis, (d) the Company looks forward to reporting further results from our drill program at California Lake, and (e) the Company’s unique exploration process continues to be successful and we look forward to completing our current drill program and reporting on additional results. Although Nine Mile believes that the expectations and assumptions on which such forward-looking information is based are reasonable, undue reliance should not be placed on the forward-looking information because Nine Mile can give no assurance that they will prove to be correct. The Canadian Securities Exchange (CSE) has not reviewed and does not accept responsibility for the adequacy or the accuracy of the contents of this release.
NINE MILE METALS ANNOUNCES DRILLING BEGINS ON ITS CALIFORNIA LAKE VMS PROJECT
Vancouver, B.C. – MILE METALS LTD. (CSE: NINE, OTCQB: VMSXF, FSE: KQ9) (the “Company” or “Nine Mile”) is pleased to announce that drilling has commenced at the Company’s California Lake VMS Project utilizing track-mount drill rigs operated by Lantech Drilling. The Company originally announced the drill program on September 20, 2022. Nine Mile will announce further drilling updates over the coming weeks. About Nine Mile Metals Ltd.: Nine Mile Metals Ltd. is a Canadian public mineral exploration company focused on VMS (Cu, Pb, Zn, Ag and Au) exploration in the world-famous Bathurst Mining Camp, New Brunswick, Canada. The Company’s primary business objective is to explore its three VMS Projects: Nine Mile Brook VMS Project; California Lake VMS Project; and the Canoe Landing Lake (East – West) VMS Project. The Company is focused on exploration of Minerals for Technology (MFT), positioning for the boom in EV and green technologies requiring Copper, Silver, Lead and Zinc with a hedge with Gold. ON BEHALF OF NINE MILE METALS LTD. “Charles MaLette” President, Director & Secretary T: 604-428-5171 E: info@ninemilemetals.com Forward-Looking Information: This press release may include forward-looking information within the meaning of Canadian securities legislation, concerning the business of Nine Mile. Forward-looking information is based on certain key expectations and assumptions made by the management of Nine Mile. In some cases, you can identify forward-looking statements by the use of words such as “will,” “may,” “would,” “expect,” “intend,” “plan,” “seek,” “anticipate,” “believe,” “estimate,” “predict,” “potential,” “continue,” “likely,” “could” and variations of these terms and similar expressions, or the negative of these terms or similar expressions. Forward-looking statements in this press release include that Nine Mile will announce further drilling updates over the coming weeks. Although Nine Mile believes that the expectations and assumptions on which such forward-looking information is based are reasonable, undue reliance should not be placed on the forward-looking information because Nine Mile can give no assurance that they will prove to be correct. The Canadian Securities Exchange (CSE) has not reviewed and does not accept responsibility for the adequacy or the accuracy of the contents of this release
NINE MILE METALS UAV DRONE SURVEY DISCOVERS (3) MASSIVE VMS SOURCE TARGETS AND (2) NEW SPRUCE LAKE FORMATION TARGET SYSTEMS
VANCOUVER B.C. – Thursday October 6, 2022. NINE MILE METALS LTD. (CSE: NINE, OTCQB: VMSXF, FSE: KQ9) (the “Company” or “Nine Mile”) announces its 1,000-line Kms UAV Magnetics Drone Survey has discovered three (3) massive VMS source targets, two (2) additional new Spruce Lake formation VMS target systems and a host of additional high priority lens targets. Nine Mile Metals has already filed for the necessary drill permits to include in our Stage 2 drill program, which is to begin in the coming weeks. The 3 VMS source targets will allow Nine Mile to ensure the prudent allocation of funds and to further ensure drilling is conducted at the highest priority targets. Figure 1: UAV Drone Survey Processed Results – Total Magnetic Intensity The results from the UAV drone magnetic survey identified three (3) massive VMS source systems, and all are a folded nose trend with a Hinge as identified in Figure 1 in white: as Hinges A, B and C. The folded nose trends are depicted in white in Figure 1 (above), while the Hinge targets are depicted in black polygons adjacent to the folded nose. In addition, the drone survey has uncovered and defined two (2) new Spruce Lake formation target systems identified as D and E (Figure 1). These five (5) targets are aligned with the northern and southern contacts in the geological mapping previously reported. Patrick J Cruickshank, MBA – CEO & Director stated “it is just incredible that this technology has filtered and removed a lot of the conductive noise in previous magnetic survey images. The similarities to the Brunswick #12 is spectacular; size, surface footprint, Hinge and plunging strong magnetic body extension, but to uncover (2) additional separate Spruce Lake Formation Contact Systems is outstanding. The definition of the images also shows potential footprints of additional Lenses in the magnetic low area of the Boucher Brook Sediments. This exploration model continues to evolve and develop into something quite exciting. We have confirmed none of these Hinge targets have been previously drilled and look forward to testing these exceptional targets in the upcoming drill program later this month. All Hinge targets in the BMC are High Priority Targets and possible sources for our Lens. We will be updating with UAV 3D subsurface modeling geophysics and drill program targeting.” Nine Mile Brook VMS Hinge Target A Brunswick #12 Deposit (Hinge and Surface Footprint) Figure 2:- Comparison Magnetics (Nine Mile Brook VMS Target Hinge A and Brunswick #12 Deposit and Extension) “The work by EarthEx Geophysical Solutions has been exceptional, the results revealing many high priority “untested” targets in multiple systems, the Boucher Brook and the Spruce Lake Formation respectively. With (3) Hinges now identified, numerous subtle, magnetic highs defined, (possible additional Lens’) we expect to discover additional mineralization within the Boucher Brook system and the California Lake Formation, the most prolific host formation to the VMS event in the BMC” stated Gary Lohman, P. Geo., Director and V.P. Exploration. In figure 3 (below) you can see the previously announced 1000-line kms UAV drone grid over the lens area VMS targets while figures 2 and 3 show the High-Definition UAV Drone proprietary processed output. Figure 3: 1,000-line kms UAV drone grid Technical Details Hinge target A is located 400m – 500m east of the VMS lens. This fits the traditional Hinge VMS model of the Bathurst Mining Camp (“BMC”), the best example being the Giant Brunswick #12. This target also has a plunging magnetic signature due north similar to the Brunswick #12 Extension. Additional similarities include a 400-500m surface footprint with a plunging extension within a folded environment. The total length is also similar (approximately 1km). Figure 2 shows the surface trace of the Brunswick #12 mineralization (black) within a folded Hinge on the flanks of a linear magnetic high. Hinge target B, located southwest of the VMS lens, is a second folded nose and plunging magnetic body to the east towards the VMS lens. Host rocks at Hinge B include both iron formation and felsic volcanics, both characteristic units associated with the BMC VMS model including the Brunswick #12. Hinge target C is located north of Hinge B, the magnetics revealing a folded structure with strong magnetics on the east limb. In addition to the Hinge targets, the drone survey also identified five (5) very subtle magnetic highs (1 – 5) within a magnetic low identical to the magnetic signature of the VMS lens (depicted as the yellow star in Figure 1). These targets all lie within the same Boucher Brook sediments that host the discovered Lens. Results of the borehole electromagnetic (“BHEM”) survey have also been received and integrated, the results confirming the presence of a strong magnetic body east of the VMS lens, on the boundary of the survey. The elevated magnetics associated with Hinge B target were not detected since they are well outside of the 200-meter search radius of the drill hole. From our previous Stage 1 drill program, DDH #7, was a very important technical success. The purpose of the drill hole was to intersect the Rhyolite Cap and confirm a number of VMS model characteristics. For the BMC model, there must be massive sulphides in the cap which was confirmed in the drill core. The presence of copper stringers in the sediments below the VMS lens, along with black chlorite healing fractures in BHEM drill hole #1 and sericitized felsic volcanics confirms that the Footwall Feeder System – is present. The disclosure of technical information in this news release has been prepared in accordance with Canadian regulatory requirements as set out in National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) and reviewed and approved by Gary Lohman, B.Sc., P. Geo. VP Exploration who acts as the Company’s Qualified Person and is not independent of the Company. About Nine Mile Metals Ltd.: Nine Mile Metals Ltd. is a Canadian public mineral exploration company focused on VMS (Cu, Pb, Zn, Ag and Au) exploration in the
NINE MILE METALS ANNOUNCES DRILL PROGRAM AT ITS CALIFORNIA LAKE VMS PROJECT
VANCOUVER, B.C. Tuesday September 20th,2022 – NINE MILE METALS LTD. (CSE: NINE, OTCQB: VMSXF, FSE: KQ9) (the “Company” or “Nine Mile”) announces it has filed for drill permits with the NB Department of Energy and Mines (“NB DEM”) for its initial phase 1 drill program at its California Lake VMS Project in the world-famous Bathurst Mining Camp, New Brunswick, Canada (“BMC”). Nine Mile has received its re-processing analysis and identified the high priority targets at California Lake. The initial drill program is slated for up to 2,000 meters, utilizing the Lantech Drilling Company track-mount drill rigs due on site in October. Figure 1: California Lake VMS Project High Priority Targets Identified over Magnetic-Conductive Analysis Figure 2: California-Spruce Lake VMS (N-NE) Trend, Stage 1 Drilling The Stage 1 drill program will focus on the Project’s eastern section, the California Lake VMS Trend, where EarthEX Geophysical Solution’s (“EarthEX”) industry leading data re-processing analysis has identified high-priority conductors. Numerous drill holes are planned to test the volcanic sediment contact where both favorable VMS mineralization and alteration, including chlorite and sericite, were identified in outcrop. The proprietary analysis has identified the subtle targets that have traditionally been successfully drilled and become economic deposits. Preliminary processing of legacy data by EarthEX has already identified high-priority conductors at California Lake coincident with favorable geologic markers. Figure 3: California Lake VMS Project Geology The California Lake VMS Project covers a large stratigraphic section of the highly prospective Spruce Lake Formation which hosts numerous VMS deposits in the Bathurst Mining Camp, including the Caribou Mine to the north. Along the California Lake VMS Trend, there are 3 VMS occurrences including California Lake 32 South, California Lake 68 South and California Lake – Murray Brook respectively. Mineralization consists of both disseminated and stringer sulphides, in addition to tabular massive sulphides previously identified. At California Lake 32 South, fine grained sulphides occur along the contact of the felsic volcanics (hangingwall ) and metasediments. Mineralization consists of a Cu rich base grading upwards to a Pb / Zn rich zone. Iron formation, a key component in many of the BMC VMS deposits, was also identified in the zone. The VMS potential of the California Lake Formation Group is well known; however, this portion of the BMC has been poorly explored in comparison to the northern section, which hosts the Caribou Mine, Restigouche and the Murray Brook Deposits. “This portion of the California Group Formation has been under explored as is the Nine Mile Brook VMS Project area. There is limited outcrop, and the geology is complex, but new technology and 3D modeling with data re-processing utilizing proprietary algorithms has unlocked the potential for numerous new discoveries in the most prospective geological formation in the BMC. The California Lake VMS Project is a high priority for the Company, and we look forward to unlocking the value to the Company’s portfolio with the results of our 1st drill program on the California Lake VMS Project”, stated Patrick J. Cruickshank, MBA, CEO & Director. The disclosure of technical information in this news release has been prepared in accordance with Canadian regulatory requirements as set out in National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) and reviewed and approved by Gary Lohman, B.Sc., P. Geo. VP Exploration who acts as the Company’s Qualified Person, and is not independent of the Company. About Nine Mile Metals Ltd.: Nine Mile Metals Ltd. is a Canadian public mineral exploration company focused on VMS (Cu, Pb, Zn, Ag and Au) exploration in the world-famous Bathurst Mining Camp, New Brunswick, Canada. The Company’s primary business objective is to explore its three VMS Projects: Nine Mile Brook VMS Project; California Lake VMS Project; and the Canoe Landing Lake (East – West) VMS Project. The Company is focused on exploration of Minerals for Technology (MFT), positioning for the boom in EV and green technologies requiring Copper, Silver, Lead and Zinc with a hedge with Gold. ON BEHALF OF NINE MILE METALS LTD. “Patrick Cruickshank” CEO and Director T: +1.512.521.4639 E: patrick@ninemilemetals.com Forward-Looking Information: This press release may include forward-looking information within the meaning of Canadian securities legislation, concerning the business of Nine Mile. Forward-looking information is based on certain key expectations and assumptions made by the management of Nine Mile. In some cases, you can identify forward-looking statements by the use of words such as “will,” “may,” “would,” “expect,” “intend,” “plan,” “seek,” “anticipate,” “believe,” “estimate,” “predict,” “potential,” “continue,” “likely,” “could” and variations of these terms and similar expressions, or the negative of these terms or similar expressions. . Forward-looking statements in this press release include that (a) the Stage 1 drill program will focus on the Project’s eastern section, the California Lake VMS Trend, (b) numerous drill holes are planned to test the volcanic sediment contact where both favorable VMS mineralization and alteration, including chlorite and sericite, were identified in outcrop, (c) new technology and 3D modeling with data re-processing utilizing proprietary algorithms has unlocked the potential for numerous new discoveries in the most prospective geological formation in the BMC, and (d) the VMS potential of the California Lake Formation Group is well known. Although Nine Mile believes that the expectations and assumptions on which such forward-looking information is based are reasonable, undue reliance should not be placed on the forward-looking information because Nine Mile can give no assurance that they will prove to be correct. The Canadian Securities Exchange (CSE) has not reviewed and does not accept responsibility for the adequacy or the accuracy of the contents of this release.
NINE MILE METALS FILES DRILL PERMITS FOR ITS 5,000M STAGE 2 DRILL PROGRAM AND COMPLETES 1,000M LINE KMS UAV MAGNETIC SURVEY
Vancouver, B.C. Thursday, September 15, 2022 – NINE MILE METALS LTD. (CSE: NINE, OTCQB: VMSXF, FSE: KQ9) (the “Company” or “Nine Mile”) announces that the company has filed the necessary drill permits with the New Brunswick Department of Energy & Mines Branch (“NB DEM”) for its previously announced 5,000m stage 2 drill program at its Nine Mile Brook VMS Project in the world famous Bathurst Mining Camp (BMC), NB, Canada. Figure 1: EarthEX Completed UAV Drone Survey Grid (Yellow) over Priority EM Targets As displayed in Figure 1 above, our geophysical exploration process has identified high priority drill targets (white dots) over the late time strong conductive targets (1-5). Nine Mile Metals has secured two (2) track mount drill rigs from Lantech Drilling in Dieppe, NB. This is the same drilling partner from our highly successful stage 1 lens area drill program. We will utilize two (2) 12-hour drill crews per drill rig, producing a 24hr drill program field team on both rigs. By executing two (2) drill rigs concurrently, we will achieve our exploration program goals quicker, more cost effective and allow our assays to be submitted to the Certified Lab much sooner. “The work program at Nine Mile Brook is progressing as planned, the integration of data continues to define Priority Targets on the western flank of the Brunswick #12. We look forward to expanding the footprint of the Lens Area mineralization with Stage 2 drilling, while also discovering additional VMS bodies at depth within the Priority Target Areas defined by EarthEx”, stated G. Lohman, B.Sc., P.Geo., Director, and VP of Exploration. Figure 2: Lens Drill Area – Stage 2 Targets , Nine Mile Brook VMS. In addition, EarthEX Geophysical Solutions (“EarthEX”) has completed the 1,000 line/kms UAV 3D High Definition Magnetic Survey grid, utilizing its proprietary drone technology and processing algorithms at the closest spacing available of (25m). EarthEX will process all raw data utilizing its advanced proprietary algorithms and integrate it into our evolving 3D exploration model. The goal is to incorporate the High-Definition Magnetics and integrate our EM and physical properties analysis along with drill core log data and define the Stage 2 drill targets on both the larger property scale and the continued exploration program at the Nine Mile Brook Lens area. EarthEX has defined all geological structures and subsurface bodies for integration into our 3D Exploration Model. There are confirmed structures for the mineralized folding and source of the Lens break. Our technical team is negotiating with RPC Science & Engineering, Fredericton, NB for Mineral Processing Analysis of the Lens 1 core samples, in its evaluation for a 3,000 Tonne bulk sample. Nine Mile Metals has received the process instructions from the NB DEM for the bulk sampling. NB DEM permits have also been applied for and received for ground based Induced Polarization (I.P.) and Time Domain Electromagnetic (TDEM) surveys over Priority Target Areas 1,2, 3 and 5 (Figure 1). Eastern Geophysics has been secured and scheduled for the surveys prior to initiating the drill program in October. The core analysis conducted by EarthEx’s physical properties lab in Selkirk, MB, has identified a unique characteristic to our VMS lens digital signature. In addition to a high conductivity response compared to the high-grade Lead-Zinc component in the core, the Copper-Gold mineralization has an unusually high chargeability signature not common to VMS deposits. Eastern Geophysics, under the direction of EarthEX, will conduct a ground-based IP Survey over the Stage 2 Lens Area in addition to the standard EM Survey. The chargeability response from additional mineralized Lens’ should be identified by a positive response in both the IP and EM signatures. EarthEX has previously used this technique with outstanding success in the BMC. Patrick J Cruickshank, MBA, CEO & Director stated “we are aggressively executing our disciplined exploration program in our determination to locate the additional VMS Lens bodies for the Nine Mile Brook discovery with cutting edge technology that has shown very positive results to date. The introduction of both IP and EM identification is a breakthrough to locating the next Lens in the sequence of this deposit. Having identified a hard break of the Lens, the next component should continue the High-Grade mineralization, and display the same digital signature that EarthEX’s core physical analysis identified. We look forward to our next update.” The disclosure of technical information in this news release has been prepared in accordance with Canadian regulatory requirements as set out in National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) and reviewed and approved by Gary Lohman, B.Sc., P. Geo. VP Exploration who acts as the Company’s Qualified Person and is not independent of the Company. About Nine Mile Metals Ltd.: Nine Mile Metals Ltd. is a Canadian public mineral exploration company focused on VMS (Cu, Pb, Zn, Ag and Au) exploration in the world-famous Bathurst Mining Camp, New Brunswick, Canada. The Company’s primary business objective is to explore its three VMS Projects: Nine Mile Brook VMS Project; California Lake VMS Project; and the Canoe Landing Lake (East – West) VMS Project. The Company is focused on exploration of Minerals for Technology (MFT), positioning for the boom in EV and green technologies requiring Copper, Silver, Lead and Zinc with a hedge with Gold. ON BEHALF OF NINE MILE METALS LTD. “Patrick J. Cruickshank, MBA” CEO and Director T: 604-428-5171 E: info@ninemilemetals.com Forward-Looking Information: This press release may include forward-looking information within the meaning of Canadian securities legislation, concerning the business of Nine Mile. Forward-looking information is based on certain key expectations and assumptions made by the management of Nine Mile. In some cases, you can identify forward-looking statements by the use of words such as “will,” “may,” “would,” “expect,” “intend,” “plan,” “seek,” “anticipate,” “believe,” “estimate,” “predict,” “potential,” “continue,” “likely,” “could” and variations of these terms and similar expressions, or the negative of these terms or similar expressions. Forward-looking statements in this press release include that (a) We will utilize (2) 12-hour drill crews per drill rig,
NINE MILE METALS COMMENCES EARTHEX 1000 LINE/KMS HD PROPRIETARY UAV MAG SURVEY OVER THE HIGH PRIORITY VMS TARGETS AT NINE MILE BROOK VMS PROJECT
Vancouver, B.C. August 25, 2022- NINE MILE METALS LTD. (CSE: NINE, OTCQB: VMSXF, FSE: KQ9) (the “Company” or “Nine Mile”) is pleased to provide an exploration update on its Nine Mile Brook VMS Project in the world famous, Bathurst Mining Camp (“BMC”) in New Brunswick, Canada. EarthEx Geophysical Solutions Inc. (“EarthEX”) has commenced a detailed UAV (Drone) high-definition proprietary technology based magnetic survey on the Nine Mile Brook VMS Project. A total of 1,000-line kilometers survey grid flown at a line spacing of 25 meters is planned to cover the recently drilled lens, priority EM targets and key stratigraphy, as displayed in Figures 1 and 2 below. Figure 1: EarthEX HD-UAV Survey Grid over VMS High Priority Targets, Nine Mile Brook VMS Project. In Figure 1 above, the 1000 line kms survey block is outlined in yellow, covering high priority targets (1 -5), (7) and (13). The UAV survey also covers the highly prospective Spruce Lake Formation volcanics which hosts target (5). This newly proven advanced proprietary UAV Drone technology from EarthEX, just released last year, will define all geological structures within the grid over our identified high priority VMS targets. Once completed, the UAV survey will identify all structural mineralized folds in the system and be integrated into our evolving 3D project model. Close spaced (25m) flight path will deliver exceptional data points to produce excellent 3D model data that will define all additional subsurface features associated with mineralization. With EarthEX inversion modeling of the data, details can be seen at depths greater than 1 kilometer. Figure 2: (Zoomed) HD UAV Grid over High Priority VMS Targets. Specifically, at the Lens area, targets 1-3 are immediately adjacent and this High Definition UAV Drone survey and the detailed 3D subsurface magnetic modeling will define the relationship between the elevated magnetics seen in figures 1 and 2 and the strong conductor axes (red). Utilizing seven (7) landing zones throughout the Nine Mile Brook VMS Property, the crew deploys the UAV Drone on preprogramed flights throughout the day. In addition to the magnetometer, the Drone is equipped with redundant GPSs for flight control and a LIDAR (Light Detection and Ranging) laser imaging system that provides real time data for collision avoidance, allowing the drone to fly as low as possible. A magnetic base station is also established to continually collect data and identify diurnal changes in the magnetics. “The results from the 1000-line kms HD UAV advanced magnetic survey will be integrated into our 3D model and combined with our other ongoing geophysics, to define all our high priority VMS targets in our (3) specific VMS target systems: the Spruce Lake and Boucher Brook formations and our recently drilled VMS Lens area. This data analysis when combined with our other ongoing geophysical analysis including the Bore Hole EM, drill core physical property analysis, and the massive sulphide VMS rhyolite cap, we soon will define the drill hole targets for our Stage 2 program, along the structural corridor that hosts the known mineralization and the strong conductors identified in targets 1 – 4. The UAV analysis will also define additional structural folds in the VMS Lens area,” stated Gary Lohman, P.Geo., Director and V.P. Exploration. At the end of each day, the survey data output is uploaded to the Earth EX Manitoba lab for QA / QC checks and preliminary interpretation. This process not only confirms the quality of the data, as targets are identified, but also modifications to the survey parameters, such as infill lines, can be made to ensure that identified targets are constrained as much as possible for modeling and drill targeting. When the survey is complete, the data is processed and added to the 3D model to assist in the geological interpretation. Patrick J. Cruickshank, MBA, CEO and Director stated, “we will continue to utilize new highly advanced technology in our exploration programs to advance our project development to discover the addition Lens’ and the multiple VMS targets in our (3) system projects at the Nine Mile Brook VMS.” The disclosure of technical information in this news release has been prepared in accordance with Canadian regulatory requirements as set out in National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) and reviewed and approved by Gary Lohman, B.Sc., P. Geo. Director and V.P. Exploration who acts as the Company’s Qualified Person, and is not independent of the Company. ON BEHALF OF NINE MILE METALS LTD. “Patrick J. Cruickshank, MBA” CEO, Director & Technical Committee T: 604-428-5171 E: info@ninemilemetals.com Forward-Looking Information: This press release may include forward-looking information within the meaning of Canadian securities legislation, concerning the business of Nine Mile. Forward-looking information is based on certain key expectations and assumptions made by the management of Nine Mile. In some cases, you can identify forward-looking statements by the use of words such as “will,” “may,” “would,” “expect,” “intend,” “plan,” “seek,” “anticipate,” “believe,” “estimate,” “predict,” “potential,” “continue,” “likely,” “could” and variations of these terms and similar expressions, or the negative of these terms or similar expressions. Forward-looking statements in this press release include that (a) UAV Drone technology from EarthEX, just released last year, will define all geological structures within the grid over our identified high priority VMS targets, (b) the UAV survey will identify all structural mineralized folds in the system and be integrated into our evolving 3D project model, (c) spaced (25m) flight path will deliver exceptional data points to produce excellent 3D model data that will define all additional subsurface features associated with mineralization, (d) UAV Drone survey and the detailed 3D subsurface magnetic modeling will define the relationship between the elevated magnetics, (e) UAV advanced magnetic survey will be integrated into our 3D model and combined with our other ongoing geophysics, (f) UAV analysis will also define additional structural folds in the VMS Lens area, (g) we will continue to utilize new highly advanced technology in our exploration programs to advance our project development to discover the addition Lens’, and (h) A
NINE MILE METALS IDENTIFIES NEW VMS HIGH PRIORITY TARGETS AT ITS FLAGSHIP NINE MILE BROOK VMS PROJECT
Vancouver, B.C. August 16, 2022- NINE MILE METALS LTD. (CSE: NINE, OTCQB: VMSXF, FSE: KQ9) (the “Company” or “Nine Mile”) is pleased to provide an exploration update on its flagship Nine Mile Brook VMS Project in the world famous, Bathurst Mining Camp (“BMC”) in New Brunswick. The Company received its geophysical re-processing 3D modeling from EarthEX Geophysical Solutions (“EarthEX”). The 3D model consolidates all existing geophysics, public and private data sets, government MegaTEM surveys, and assays. EarthEX has re-processed all the data sets with their proprietary algorithms and have provided the results and prioritized targets. Using late time conductive analysis, we now have eleven (11) high priority VMS targets at Nine Mile Brook, displayed on the image below. Of the eleven priority Targets, three (3) are immediately surrounding the recently drilled Nine Mile Brook lens. Figure 1: Newly Identified High Priority VMS Targets over Late Time Conductance Analysis. There are clearly three (3) independent VMS target systems present including: Boucher Brook Formation Sediment Contacts, Spruce Lake Formation Contacts and Vent-Lens Target Zone Area. In the above figure, eleven (11) target zones are presented overlying the late time conductance, a required characteristic of BMC VMS mineralization. The signature derived from the late time channels of the EM response which is highly indicative of stronger conductors such as VMS mineralization. Within each target zone, multiple geophysical anomalies have been delineated by EarthEX, the conductive responses shown in red (strong), yellow (moderate) and blue (weak). Adjacent to the lens, there are three (3) specific large target zones with well defined, strong conductors, most with a signature of approximately 500 meters or less in length, a characteristic of BMC deposits, and indicative of a discreet subsurface target not related to a formational response. These targets are a high priority due to recent drill results that suggest the lens was proximal to a vent complex. All these target zones are within the Boucher Brook Sediments with individual conductors coincident with or near parallel to the Willett Horizon, the 800-meter structural zone that broke off the lens and associated rhyolite. As shown in Figure 2, there are three (3) high priority conductors defined within 200 meters of the lens. Figure 2: Newly Identified High Priority Conductors Lens Area overlying Magnetics To the east, within the Boucher Brook Sediments, four (4) target zones have been defined associated with the sedimentary contact with the Canoe Landing Lake volcanics. Although longer in extent, they have a high possibility of a deeper, subsurface source. To the west, two (2) target zones have been defined related to the larger California Lake Group (Spruce Lake Formation), a key stratigraphic unit which is the most favorable host to many deposits in the BMC including Murray Brook, Restigouche, Canoe Landing Lake, McMaster, and Trevali’s currently producing Caribou Mine. Figure 3: Nine Mile Project Geology (Spruce Lake, Boucher Brook & Canoe Landing Lake Formations) “Target definition to date has been superb, not only providing three (3) discreet conductors associated with the Lens Area, but additional high priority targets to the west within with the Spruce Lake Formation and to the east, within the Boucher Brook Formation sediments package,” stated Gary Lohman, P.Geo., VP Exploration. Patrick J Cruickshank, MBA, CEO, states, “We now have our roadmap for the entire Nine Mile Brook VMS Project. We have clearly identified three (3) VMS target systems within multiple VMS host formations. We now have our identified lens targets for the multiple lens exploration plan. We have the structures identified within the Lens Drill Target Area. When we integrate the BHEM and petrophysics analysis we will be able to define the drill collars specifically. We look forward to announcing the integrated 3D model with our ongoing analysis results shortly.” The disclosure of technical information in this news release has been prepared in accordance with Canadian regulatory requirements as set out in National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) and reviewed and approved by Gary Lohman, B.Sc., P. Geo. VP Exploration who acts as the Company’s Qualified Person, and is not independent of the Company. About Nine Mile Metals Ltd.: Nine Mile Metals Ltd. is a Canadian public mineral exploration company focused on VMS (Cu, Pb, Zn, Ag and Au) exploration in the world-famous Bathurst Mining Camp, New Brunswick, Canada. The Company’s primary business objective is to explore its three VMS Projects: Nine Mile Brook VMS Project; California Lake VMS Project; and the Canoe Landing Lake (East – West) VMS Project. The Company is focused on exploration of Minerals for Technology (MFT), positioning for the boom in EV and green technologies requiring Copper, Silver, Lead and Zinc with a hedge with Gold. ON BEHALF OF NINE MILE METALS LTD. “Patrick J. Cruickshank, MBA” CEO & Director T: 604-428-5171 E: info@ninemilemetals.com Forward-Looking Information: This press release may include forward-looking information within the meaning of Canadian securities legislation, concerning the business of Nine Mile. Forward-looking information is based on certain key expectations and assumptions made by the management of Nine Mile. In some cases, you can identify forward-looking statements by the use of words such as “will,” “may,” “would,” “expect,” “intend,” “plan,” “seek,” “anticipate,” “believe,” “estimate,” “predict,” “potential,” “continue,” “likely,” “could” and variations of these terms and similar expressions, or the negative of these terms or similar expressions. Forward-looking statements in this press release include that (a) when we integrate the BHEM and petrophysics analysis we will be able to define the drill collars specifically, (b) adjacent to the lens, there are three (3) specific large target zones with well defined, strong conductors, most with a signature of approximately 500 meters or less in length, a characteristic of BMC deposits, and indicative of a discreet subsurface target not related to a formational response, (c) to the east, within the Boucher Brook Sediments, four (4) target zones have been defined associated with the sedimentary contact with the Canoe Landing Lake volcanics, and although longer in extent, they have a high possibility of a deeper, subsurface source, and (d)
Nine Mile Metals Announces Stock Option Grant
Vancouver, B.C. August 15, 2022- NINE MILE METALS LTD. (CSE: NINE) (the “Company” or “Nine Mile”) announces that it has granted 500,000 stock options to a consultant of the Company. The options will vest 50% immediately and 50% in three months and may be exercised at an exercise price of CAD $0.25 per common share, for a period of 2 years from the date of issuance or earlier in accordance with the Company’s incentive stock option plan. Following the grant of stock options, the Company now has a total of 4,650,000 stock options representing 8.8% of the outstanding common shares of the Company. About Nine Mile Metals Ltd.: Nine Mile Metals Ltd. is a Canadian public mineral exploration company focused on VMS (Cu, Pb, Zn, Ag and Au) exploration in the world-famous Bathurst Mining Camp, New Brunswick, Canada. The Company’s primary business objective is to explore its three VMS Projects: Nine Mile Brook VMS Project; California Lake VMS Project; and the Canoe Landing Lake (East – West) VMS Project. The Company is focused on exploration of Minerals for Technology (MFT), positioning for the boom in EV and green technologies requiring Copper, Silver, Lead and Zinc with a hedge with Gold. ON BEHALF OF NINE MILE METALS LTD. “Charles MaLette” President, Director & Secretary T: 604-428-5171 E: info@ninemilemetals.com Forward-Looking Information: This press release may include forward-looking information within the meaning of Canadian securities legislation, concerning the business of Nine Mile. Forward-looking information is based on certain key expectations and assumptions made by the management of Nine Mile. In some cases, you can identify forward-looking statements by the use of words such as “will,” “may,” “would,” “expect,” “intend,” “plan,” “seek,” “anticipate,” “believe,” “estimate,” “predict,” “potential,” “continue,” “likely,” “could” and variations of these terms and similar expressions, or the negative of these terms or similar expressions. Although Nine Mile believes that the expectations and assumptions on which such forward-looking information is based are reasonable, undue reliance should not be placed on the forward-looking information because Nine Mile can give no assurance that they will prove to be correct. The Canadian Securities Exchange (CSE) has not reviewed and does not accept responsibility for the adequacy or the accuracy of the contents of this release.
Nine Mile Metals Announces Annual General and Special Meeting Results
Vancouver, B.C. August 10, 2022- NINE MILE METALS LTD. (CSE: NINE, OTCQB: VMSXF, FSE: KQ9) (the “Company” or “Nine Mile”) announces that at its annual general and special meeting (the “AGSM”) held on August 9, 2022, Nine Mile’s shareholders approved by majority: to elect all six directors standing for election; to re-appoint Saturna Group Chartered Professional Accountants LLP as the auditors of the Company; and to reapprove the Company’s 10% rolling stock option plan. Gary Lohman has been appointed as a new member of the Company’s Board of Directors and as the VP Exploration. Mr. Lohman is a founder and Chief Operating Officer of Royal Stewart Resources Corp. As an exploration geologist, he has 40 years of management experience in both precious and base metal exploration. He is skilled in geological, geochemical and geophysical exploration techniques in a wide variety of settings including Volcanogenic Massive Sulphides (VMS), Porphyry & IOCG (Copper/Gold) Style Deposits. Experience includes evaluations / research conducted on bonanza grade and bulk tonnage gold-silver properties in Canada, Mexico, California, Ecuador & Chile. Mr. Lohman owns 5,921,743 common shares of the Company representing 11.2% of the issued and outstanding. A total of 26 shareholders were represented in person or by proxy with 15,566,814 common shares voted representing 35.28% of the Company’s outstanding common shares. Following the AGSM, Charles MaLette will be stepping down from his role of Chief Executive Officer (“CEO”). Mr. MaLette will remain as the President and Secretary of the Company. Patrick Cruickshank has been appointed as the new CEO of the Company, effective August 9, 2022. Patrick Cruickshank has been a director of the Company since January 24, 2022. Mr. Cruickshank received his MBA from the Schulich School of Business at York University in 1989. Mr. Cruickshank brings over 20 years of experience from the wealth management sector working for Merryll Lynch, Legg Mason, and Citigroup Capital Markets, where he focused on creating and protecting wealth while specializing in funding growth companies. Mr. Cruickshank was an NFLPA advisor from 2000 to 2012, until transitioning into private equity. Since 2012, Mr. Cruickshank has concentrated on acquiring, funding and growing companies in the Energy and Resource Sector. Mr. Cruickshank has been the current CEO of Fiddlehead Mining Corp. since 2019 and serves as a director on a number of private companies. Mr. Cruickshank is also a former Canadian National Team soccer player, US NCAA Division 1 Collegiate player and coach. Mr. Cruickshank owns indirectly 9,129,354 common shares of the Company representing 17.2% of the issued and outstanding. About Nine Mile Metals Ltd.: Nine Mile Metals Ltd. is a Canadian public mineral exploration company focused on VMS (Cu, Pb, Zn, Ag and Au) exploration in the world-famous Bathurst Mining Camp, New Brunswick, Canada. The Company’s primary business objective is to explore its three VMS Projects: Nine Mile Brook VMS Project; California Lake VMS Project; and the Canoe Landing Lake (East – West) VMS Project. The Company is focused on exploration of Minerals for Technology (MFT), positioning for the boom in EV and green technologies requiring Copper, Silver, Lead and Zinc with a hedge with Gold. ON BEHALF OF NINE MILE METALS LTD. “Charles MaLette” President, Director & Secretary T: 604-428-5171 E: info@ninemilemetals.com Forward-Looking Information: This press release may include forward-looking information within the meaning of Canadian securities legislation, concerning the business of Nine Mile. Forward-looking information is based on certain key expectations and assumptions made by the management of Nine Mile. In some cases, you can identify forward-looking statements by the use of words such as “will,” “may,” “would,” “expect,” “intend,” “plan,” “seek,” “anticipate,” “believe,” “estimate,” “predict,” “potential,” “continue,” “likely,” “could” and variations of these terms and similar expressions, or the negative of these terms or similar expressions. Although Nine Mile believes that the expectations and assumptions on which such forward-looking information is based are reasonable, undue reliance should not be placed on the forward-looking information because Nine Mile can give no assurance that they will prove to be correct. The Canadian Securities Exchange (CSE) has not reviewed and does not accept responsibility for the adequacy or the accuracy of the contents of this release.