PROJECTS

OVERVIEW

4 projects in the World Famous Bathurst Mining Camp

Nine Mile Metals Ltd. (CSE: NINE) (OTCQB: VMSXF) (FSE: KQ9) is a publicly listed mining company, with 4 projects in the Bathurst Mining Camp district in New Brunswick, Canada.

The Bathurst Mining Camp is one of the largest volcanogenic massive sulphide (VMS) camps in the world covering approximately 3,800 km2, hosting 95 (Cu, Pb, Zn, Ag Au) occurrences and 45 deposits. The host geology is referred to as the Bathurst Supergroup.

BAthURST MINING CAMP

The third largest mining camp in the world with 95 occurrences and 45 deposits of Copper, Lead, Zinc, Silver and Gold of which 25 over 1 MT

World class mining camp

Host to famous Brunswick #12 (336Mt)

3rd largest mining camp in the world

Highly skilled local mining workforce

Deep water ocean port

Year-round access to projects

Rail & power infrastructure

Voted Top Mining Jurisdiction in Canada & Globally

With mineral deposition occurring approximately 470 million years ago, the camp has undergone significant structural activity with mineralization folded, faulted and remobilized. Due to the complex environment, most geologists believe only 30% of potential deposits have been located to date. With 70% yet to be discovered including, as consensus believes, another giant such as the Brunswick 12 (335 Million Tonnes), innovative technology will play a key role especially in a camp with 1% outcrop.

Click image to enlarge

Nine Mile Brook VMS Project

DRILL PROGRAM #2 UNDERWAY

  • 229 Claim Units
  • 50.04 km2 in size
  • Drill Assays certified to 10.12 % Cu, 1.00 % Zn, 1.41 % Pb, 91.47 G/T Ag, And 0.84 G/T Au Over 15.10m
  • Currently using cutting-edge 3D-AI technology
  • 10km from one of the largest Zinc mines in the world

California Lake VMS Project

Drill Program #1 Completed

  • 164 Claim Units 
  • 35.83 Km2 in size
  • Cu, Pb, Zn, Ag Au
  • 2023 Drill Program – VMS Results up to 19m

Canoe Landing Lake E&W VMS Project

 
  • 67 Claim Units  
  • 14.64 Km2 in size
  • 9 occurrences / deposits & 3km NW of the Canoe Landing Lake Deposit (22.8 million tons) with geological reserves of 0.64% Pb, 1.82% Zn, 0.56% Cu. 0.94 oz/ton Ag and 0.034 oz/ton Au

The Wedge VMS Project

Recently Acquired 100%

  • 164 Claim Units  
  • 35.83 Km2 in size
  • Measured Resource 545,200T* (1.75% Cu, 1.71% Pb & 5.21% Zn) to a depth of 274 meters.
  • The Wedge Project consists of 164 claim units covering 35.83 Km2
  • The Wedge deposit was discovered by Cominco in 1957-58 after drilling an EM Anomaly

* McCutcheon et al., 2005. * Note: The resource is historical and cannot be relied upon.

2024 Drill Program

2024 Exploration Roadmap for Western Portfolio

Wedge Drill Program Targets 1 & 2 are the Primary focus of Phase 1 of 2024 drill program.

Nine Mile acquired an additional 10.78 KM² of strategic claims adjacent to its California Lake and Nine Mile Brook VMS Projects.

Nine Mile mobilizes the drill rig for the continuation of the Phase 2 drilling program at California Lake & the Wedge.

2024 Exploration Geophysics compilation of all 3 Leading Edge Proprietary Technology Partners.

Click to enlarge

REGIONAL MAPPING

Click images above to enlarge

Enter your details in the form to sign up for our News Alerts