CSE: NINE  |  OTCQB: VMSXF  |  FSE: KQ9
CSE: NINE  |  OTCQB: VMSXF  |  FSE: KQ9

Unlocking New Brunswick's Historic Critical Minerals Camp Using Modern Data, AI-Driven Targeting & Advanced Exploration Technologies

Positioned at the intersection of copper, critical minerals, and the infrastructure buildout of AI, energy & electrification

Latest News

136 km²
Land Package
624
Mineral Claims
4
VMS Projects
3rd Largest
VMS Camp in the World

Nine Mile Metals Ltd. (CSE: NINE) (OTCQB: VMSXF) (FSE: KQ9) is a publicly listed mining company, with 4 projects in the world-famous Bathurst Mining Camp district in New Brunswick, Canada.

Four Projects, One District
Bulk Sample Underway

Nine Mile Brook

50.04 km² · 229 claims

Highest-grade copper ever drilled in the camp — 10.12% Cu over 15.10m.

Target #6 in Active Phase 3

California Lake

35.83 km² · 164 claims

Mineralization consists of a Cu rich base grading upwards to a Pb / Zn rich zone.

Targeting Underway

Canoe Landing Lake

14.64 km² · 67 claims

Surrounds a known deposit and connects the Wedge to California Lake.

10,000m Phase 3 — Drilling Now

The Wedge

35.83 km² · 164 claims

Past-producing copper mine. New high-grade lens on the western flank.

EXCEPTIONAL HIGH-GRADE COPPER, LEAD, ZINC, SILVER AND GOLD

* McCutcheon et al., 2005. * Note: The resource is historical and cannot be relied upon.

The Camp Is Proven. The Technology Is New. The Results Are In.

WHY NINE MILE, WHY NOW
3.49% CuEq

New high-grade lens at a past-producing copper mine — three phases drilled, each one extended the system. The thesis is playing out hole by hole.

24.55m true width · WD-26-09 · NI 43-101 · NR Aug 12, 2026

10.12% Cu

Highest-grade copper ever drilled in the Bathurst Mining Camp — at Nine Mile Brook.

15.10m · NM220004 · NI 43-101 · NR Jul 8, 2022

7 Targets

Modern AI-driven surveys defined seven high-conviction drill targets along the 6.5 km Wedge VMS Trend — now being tested in the active 10,000m program.

Maxwell Plate modelling · EarthEx + Apex Geoscience

335+ Mt

Next door. Nine Mile holds 136 km² across four projects in the camp that produced Brunswick No. 12 — one of the largest underground mines ever mined.

624 claims · road, rail & deep-water port

50,000 t

Copper in one AI hyperscale data centre — up to 10× a conventional facility. The AI buildout is a copper buildout.

Copper Development Association · S&P Global, Jan 2026

Resource estimate underway

Three phases drilled, each one extended the system. Phase 3 is underway and returning certified assays. Apex Geoscience is rebuilding the model — the step from drill results to a defined deposit.

Wedge NI 43-101 resource estimate in progress · Apex Geoscience

Featured Media

2026 Corporate Presentation

Four VMS projects. One district. Multiple catalysts. Download the latest presentation and investor fact sheet.

Subscribe To Our Newsletter

Get notified about the latest company news and updates by signing up below.