CSE: NINE  |  OTCQB: VMSXF  |  FSE: KQ9
Projects · Nine Mile Brook

Bulk Sample

Permitted · Underway · Results Pending

1,000 t
Bulk Sample
Permitted
NBDEM Bulk Sample Permit
SGS
Lakefield, Ontario
Glencore
Direct Smelter Testing

Nine Mile Brook

National Research Council
Funding received to perform Gravity separation, identify smelters, and assess potential processing options for high Indium mineralization.

Bulk Sample Program Highlights

See Technical Notes.

Click image to enlarge

Bulk Sample Program — Permitted And Underway

Permitted · Underway · Results Pending
What's Done

Bulk sample permit approved. Site development and reclamation plan approved. Baseline water and sediment sampling complete. Notice of Planned Work filed.

Metallurgical Analysis — Bulk Sample

Two representative samples of the lens — one from the copper-rich end, one from the lead-zinc-silver end — together with the entire 15.10 m core intersection from NM220004, the highest-grade copper hole ever drilled in the Bathurst Mining Camp. All at SGS in Lakefield, Ontario.

Direct Smelter Testing Analysis — Glencore Horne Smelter. SGS will provide two specific samples to Glencore, who will conduct their own metallurgical and mineralogical analysis for their Horne Smelter in Rouyn-Noranda, Quebec.

What's Being Tested

How the material breaks down, and how the five metals separate from the rock and from each other. SGS is running head grade analysis, mineral identification, hardness testing, and gravity and flotation work. Results will be reported when received.

No metallurgical results from the bulk sample program have been reported to date. Recovery, concentrate quality and any processing route remain undetermined until testing completes, and no assurance is given that testing will demonstrate commercially viable recovery. No mineral resource or mineral reserve has been estimated on any Company property. Certified drill assays as reported in the Company’s news release of 8 July 2022. See Technical Notes.

Technical Notes

Notes on Drill Results

WD-26-09 and WD-26-10 intervals are reported as true widths. All other widths are drilled core lengths and true widths are not yet known. Certified assay results and visual estimates from core logging are identified separately wherever they appear. Assays for the remaining Phase 3 holes are pending at ALS Global.

Copper Equivalent

Copper equivalent values are for comparison only and are not directly comparable between holes; each is calculated on the metal prices and recovery assumptions disclosed in its own news release, which differ by release.

Hole / GroupPricing DateSourceRecovery
2024 Wedge holes13 May 2024—80%
WD-25-0213 February 2026—80%
Nine Mile Brook bulk sample27 February 2026—80%
WD-25-2B1 April 2026—80%
WD-26-0911 August 2026Bloomberg95%
WD-26-0715 August 2026Bloomberg95%
WD-26-1026 August 2026Kitco95%
Historical Information

Cominco production figures for the Wedge — approximately 1.5 Mt at 2.88% Cu, mined 1962–1968 — are historical, are sourced to McCutcheon et al. (2005), predate National Instrument 43-101, have not been verified by a Qualified Person, and are not current mineral resources or mineral reserves. Historic camp production tonnages and grades are sourced to McCutcheon, S.R. and Walker, J.A. (2020), Geoscience Canada, v.47(3), Table 1, published by the Geological Association of Canada.

No Mineral Resource

No mineral resource or mineral reserve has been estimated on any Nine Mile Metals property to date. A mineral resource estimate for the Wedge is in progress; there is no assurance that it will be completed or that it will support a mineral resource. Geophysical targets shown are conceptual, are derived from modelling, and are not mineral resources.

QA/QC and Sample Security

Samples are analyzed by ALS Global, Moncton, New Brunswick, an accredited laboratory independent of the Company. Base metals by ME-ICP61a four-acid digestion with ICP-AES; gold by fire assay Au-AA23 with AA finish; overlimit gold by gravimetric analysis and overlimit base metals by OG62. ALS runs its own QA/QC protocols including coarse and pulp duplicates. The Company inserts certified reference materials, duplicates and blanks with review of all results; QA/QC and data validation were performed and no material errors were observed.

Qualified Person

The scientific and technical information in this presentation has been reviewed and approved by Gary Lohman, B.Sc., P.Geo., VP Exploration and Director, the Company’s Qualified Person under National Instrument 43-101. Mr. Lohman is not independent of the Company. The Qualified Person has verified the data underlying the technical information in this presentation, including sampling, analytical and test data.

District Ranking

References to the Bathurst Mining Camp as the third largest VMS camp in the world are based on published district tonnage comparisons, which rank the camp third at approximately 250 Mt. Source: Barrie, C.T. and Hannington, M.D., Classification of Volcanic-Associated Massive Sulfide Deposits Based on Host-Rock Composition, Reviews in Economic Geology. That comparison excludes districts in China and the former Soviet Union.

Subscribe To Our Newsletter

Get notified about the latest company news and updates by signing up below.