CSE: NINE  |  OTCQB: VMSXF  |  FSE: KQ9
Projects · Bathurst Mining Camp

California Lake

Proven At Depth. The Source Is The Target.

35.86 km²
Land Package
164
Mineral Claims
Cu, Pb, Zn, Ag, Au
Shows
Target #6
To Be Tested

Overview

VMS system confirmed at depth. Target #6 to be tested.

  • Phase 1 Program successfully Drills 7 of 8 VMS target holes, and confirms VMS system (up to 19m depth).
  • EarthEx 3D-AI Technology utilized in confirming drill targets.
  • Mineralization consists of a Cu rich base grading upwards to a Pb / Zn rich zone.
  • High priority host Spruce Lake formation targets.
  • Recently acquired 40 Mile Brook property
California Lake Project – Bedrock Geology, APEX Geoscience, October 2026
Click image to enlarge

California Lake — Proven At Depth. The Source Is The Target.

1.5 km

Conductive trend defined from reprocessed geophysics, running south to Target #6

up to 18.45m

Drill intersection widths

$40,000

NBJMAP exploration grant from the Province of New Brunswick

What The Drilling Proved:

The 2022 drilling confirmed VMS mineralization at depth across the target. EarthEx modelling traces a strong late-time conductive trend running 1.5 km south toward Target #6 — interpreted as the source of the system. Target #6 to be tested.

The Position:
Click image to enlarge
Target #6 is next to be tested.

Drill results are certified assays as reported in the Company’s news releases of November and December 2022. See Technical Notes.

2022 Drill Results

Phase 1 Drill Program Certified Assays 2022 from Oct 2022 Drill Program

Click image to enlarge.

Maps

Click images above to enlarge

Junior Mining Hub Interactive Map

Junior Mining Hub is the ultimate destination for all Junior Mining News and information.

Technical Notes

Drill Results

Results are from the 2022 Phase 1 program (news releases December 22, 2022 and January 3, 2023), assayed by ALS Global. Intervals are core lengths; true widths have not been determined. CL23-10-01 observations (December 8, 2023) are visual only and are not a substitute for assays.

Geophysics

A BHEM survey of CL23-10-01 identified a moderate conductor about 230 m downhole (news release August 15, 2024). Geophysical targets are conceptual.

Property

100% owned (option exercised April 2024), subject to a 2% NSR, half of which may be purchased for $1,000,000.

No Mineral Resource; Qualified Person

No mineral resource has been estimated on this property. Technical information on this page was reviewed and approved by Gary Lohman, B.Sc., P.Geo., Qualified Person under NI 43-101 (not independent of the Company).

District Ranking

References to the Bathurst Mining Camp as the third largest VMS camp in the world are based on published district tonnage comparisons, which rank the camp third at approximately 250 Mt. Source: Barrie, C.T. and Hannington, M.D., Classification of Volcanic-Associated Massive Sulfide Deposits Based on Host-Rock Composition, Reviews in Economic Geology. That comparison excludes districts in China and the former Soviet Union.

See our full Disclaimer and Cautionary Notes.

Subscribe To Our Newsletter

Get notified about the latest company news and updates by signing up below.